Nov 17, 2022· Example for concrete calculator in Yards, Here, I want to show you a calculation for a 20' by 20' and 3'' thickness concrete slab. 1 . 20×20 = 400 square feet. 2 . 3/12 = 0.25 feet. 3 . 400x 0.25 = 100 cubic feet. 4 . 100 x 0.037 = 3.7 cubic yards. The above example is solving for volume in yards.
DetailsIn India, concrete has traditionally been produced on site with the primitive equipments and use of large labour force. Ready mixed concrete is an advanced technology, involving a high degree of mechanization and automation. ... If you are unsure about the quantity of concrete needed, you can use skip this step and go to our Concrete calculator ...
DetailsSep 24, 2021· Material estimation for M25 grade concrete. / Estimation of cement, sand, & aggregates in M25 ( 1:1:2 mix ratio) concrete. A. Material cost: The average ongoing market rate in India is considered for calculation purposes. B. Labor cost : The labor rate for concrete ranges from INR 1000/- to 1600/- per CUM.
DetailsIf you are planning on buying bags of premix concrete then check out our Premix Concrete Calculator (how many bags to buy). Give it a try and then be sure to try out our other calculators as well! For size = 6 inch: Cubic Yards to be filled = (L * W * 0.5 / 27); For size = 8 inch: Cubic Yards to be filled = (L * W * 0.67 / 27); For size = 12 inch:
DetailsDec 29, 2021· To find How To Calculate Concrete Quantity in Column we need to first find out the depth of column below plinth beam. Here 1.5m is given from ngl to excavation level. 300mm is given from ngl to road level. And from road level to plinth level it is given 750mm. So we add all these length and subtract h2 and pcc thickness in order to get depth of ...
DetailsSep 27, 2021· The average ongoing market rate in India is considered for calculation purposes. B. Labor cost : The labor rate for concrete ranges from INR 900/- to 1400/- per CUM. Let us take the average rate of INR 1150/ - for calculation purposes. Now, let us calculate the cost of the M15 grade concrete per CUM in the table format.
DetailsSep 07, 2022· So enter in the footing calculator, 6" depth by 12" width (always figure steps with a 12" width) by 9' length. This totals .17 cubic yards. The total concrete needed for the 3' by 3' porch will be .28 cubic yards. (.11 + .17 cubic yards = .28 cubic yards) Repeat this for added layers of steps. 3' x 3' Porch.
DetailsNov 09, 2022· The steps involved in using a concrete calculator are as follows: To begin, you will need to make a rough estimate of the amount of concrete that will be required. Determine the length, breadth, and height of your concrete slabs, as well as the amount of area that you like to pave. Find out how much everything weighs.
DetailsConcrete Calculator for Footing, Column, Slab and Stair. This will estimate the volume of concrete needed, number of bags of cement, volume of sand and volume of gravel for different types of concrete elements. It covers concrete calculator for column footing, wall footing, floor slab, rectangular column, circular column and stair.
DetailsAug 03, 2018· CALCULATION FOR AGGREGATE QUANTITY. Consider volume of concrete = 1m3. Dry Volume of Concrete = 1 x 1.54 = 1.54 m3. Aggregate = (3/5.5) x 1.54 = 0.84 m3 ∴ 3 is a part of cement, 5.5 is sum of ratio. Density of Aggregate is 1500/m3. Calculation for KG = 0.84 x 1500 = 1260 kg. As we know that 1 m3 = 35.31 CFT.
DetailsStep -1 Write all the known values of the materials. Here we should know that, Total Concrete = 10 m3. M15 means the ratio of ingredient in concrete shoud be (Cement:Sand:Aggregate) = (1:2:4) Density of cement = 1440 kg/m3. Density of steel reinforcement = 7850 kg/m3.
Details4) if required, convert thickness of concrete structure inch to feet. 5) calculate the volume of concrete structure in cubic feet by multiplying square footage and thickness. 6) if required, convert cubic feet of concrete into cubic yard by multiplying 0.037 to determine concrete quantity in cubic yard.
DetailsWith this formula in mind, you'll be able to calculate just how much concrete or cement you'll need for your project: One 60 -lb bag of concrete gives you. 45 cubic feet of concrete when mixed with 2.5 quarts of water. In order to have enough concrete for one cubic foot, you'll require 2.2 bags of 60 -lb concrete.
DetailsLength. Select unit Meter Feet. Breadth. Select unit Meter Feet. Depth. Select Depth/Height in inches 4.5 inches 6 inches. Grade of concrete. Select Grade of concrete M20 M25. Grade of concrete M10, M15, M20, M25 depends on ratio of Cement, …